I'm a retired educator (teacher/principal) who moved from Northern California to Payson, Arizona in September, 2010.
This blog will chronicle my adventures as I explore a different ecosystem and build my new home.

Thursday, June 9, 2011

Progress, and More Progress

Darren is sanding and getting ready to put down the bamboo flooring on Friday.


The downstairs bathroom got a toilet.


The solar hot water heater is installed. It's a big 120 gallon tank so we should never run out of hot water.


The downstairs baseboards and tile are finished.


Randy got his garage toilet installed.


The painting is 85% done on the outside of the house.


Love the red door and the stained beams in the entry.


One color gray for the siding and a little darker color for the trim around the windows and the stucco areas.


South facing deck stained and painted.


Decks are waiting for railings. And we ordered a 7 ft. tall fence for a section of the yard for Cooper and a garden.

The Heat/Vac guys installed the in-house vacuum today as well as the speaker system in the great room and kitchen. And they terminated the cables for the computer network.

P.S. We have a move-in date......June 25th!!

1 comment:

  1. Congrats on all the progress. So exciting to have a move in date!

    ReplyDelete