The downstairs bathroom got a toilet.
The solar hot water heater is installed. It's a big 120 gallon tank so we should never run out of hot water.
The downstairs baseboards and tile are finished.
Randy got his garage toilet installed.
The painting is 85% done on the outside of the house.
Love the red door and the stained beams in the entry.
One color gray for the siding and a little darker color for the trim around the windows and the stucco areas.
South facing deck stained and painted.
Decks are waiting for railings. And we ordered a 7 ft. tall fence for a section of the yard for Cooper and a garden.
The Heat/Vac guys installed the in-house vacuum today as well as the speaker system in the great room and kitchen. And they terminated the cables for the computer network.
P.S. We have a move-in date......June 25th!!