The laundry floor is grouted and the cabinets are in place. (The cabinets look blue in this picture but they are grey.) We are hoping we have enough kitchen granite counter top left over for this counter.
The entry way is now finished. We were short a few tiles but they arrived yesterday. (It's a little dirty.)
Darren and Dan are working on the floor in the master bath.....it should be grouted by the end of today. (Manhattan with 4 squares of the Negro Marquina marble in a random pattern.)
The counter tops in two bathrooms (maybe 3 if we have enough marble) will be Negro Marquina. It's almost the opposite of the Manhattan marble.......black with a white vein running through it.
The master shower is almost done. Darren is working on the pan (bottom) which will be 2 inch squares of Manhattan.
Downstairs guest bath has a line of Negro Marquina.
Here's the finished downstairs shower/bath. We just bought a curved rod and I'll work on getting a shower curtain (something with black in it I think.) They did a nice job on the window surround, and the outside finished edge is Manhattan quarter round.
No comments:
Post a Comment